    My favorite part about data centers in space is it may actually be impossible from a physics standpoint to build the heat radiators large enough for even a small one. Even though space is cold and would seem to make sense, it is also a destructive vacuum and to radiate even a small amount of heat outside of a shielded core would take a huge array of radiators

    • Nouvellalia@lemmy.world
      link
      fedilink
      English
      arrow-up
      10
      ·
      15 hours ago

      No, it’s totally possible. Not with any technology we’ve ever built, maybe not with any technology we can build, but physics doesn’t preclude it outright.

      Your point still stands though. It’s a promise that’s impossible to meet within the lifetime of the investors.

    • brucethemoose@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      ·
      edit-2
      14 hours ago

      It’s possible, but not economical.

      For basically any “space datacenter” scenario, imagine putting that same thing in a vast desert instead. You’ll find it’s easier and an order of magnitude cheaper.

      • حمید پیام عباسی@crazypeople.online
        link
        fedilink
        English
        arrow-up
        2
        ·
        edit-2
        12 hours ago

        Yeah, maybe not impossible, but I mean extremely unlikely. I found a thread on reddit that had examples and a spreadsheet https://www.reddit.com/r/IsaacArthur/comments/11kp7s4/how_large_of_a_heatradiator_would_a_spacecraft/

        To run a data center in space you would need some kind of reactor producing around 100 MW. If rejecting 100 MW at 800 K

        A= 100,000,000 / 0.85×5.670374419e−8×800

        The number is the Stefan-Boltzmann constant (σ) https://physics.knox.edu/OnlineHW/zTest-PhysicalConstants.html

        A≈5,065 m²

        So roughly:

        5,100 m² of radiating surface

        That is a square about:

        √(5065) ≈71 m per side

        If it is a double-sided radiator panel, the physical panel area could be about half:

        2,530 m² of panel, about 50 m × 50 m, assuming both sides radiate effectively.

        Also temperature matters enormously so

        At emissivity 0.85:

        Radiator temp Area for 100 MW
        300 K ~256,000 m²
        500 K ~33,200 m²
        800 K ~5,100 m²

        So the answer is about 5,000 m² (lol this is like “a football field” on each side) at 800 K, but balloons to absurd levels like hundreds of thousands of m² if you are trying to dump room-temperature waste heat which there would be a significant amount of. That is for a single small data center at current power needs. In the US alone data centers use 176 TWh (https://www.congress.gov/crs-product/R48646), so there is no chance we are going to be migrating a significant portion of it into space.

        • brucethemoose@lemmy.world
          link
          fedilink
          English
          arrow-up
          2
          ·
          edit-2
          8 hours ago

          800K is 526C! You can’t run a datacenter at that.

          80C (still very hot for datacenter hardware coolant) is 350K. And there are other challenges, like effects from being in LEO, or proximity to wherever the solar array is.


          And this is just one of MANY ridiclous engineering challenges. Another great example is that GPUs, memory, and SSDs get random bit flips in orbit, and the issue gets worse with smaller lithography: https://www.itpro.com/server-storage/high-performance-computing-hpc/367323/hpes-supercomputer-helps-iss-astronauts

          There’s tons of spam about “solving” this after the Tech Bro boom, but I don’t really buy anything I’ve seen. Nothing but a bunch of lead (or the Earth’s atmosphere) is going to stop fat gamma rays or extremely fast nuclei.

          • حمید پیام عباسی@crazypeople.online
            link
            fedilink
            English
            arrow-up
            2
            ·
            8 hours ago

            800K is 526C! You can’t run a datacenter at that.

            Yeah, the temperature was an estimate for the nuclear reactor that would be needed lol, I tried to explain that most of the datacenter would be closer to room temperature which would require absurd sizes of radiators

            • brucethemoose@lemmy.world
              link
              fedilink
              English
              arrow-up
              1
              ·
              edit-2
              7 hours ago

              To be fair, 100MW is pretty big.

              AI doesn’t actually need that much. I’m pretty sure entire models like GLM 5.2 or Deepseek v4 are trained (and served) on a much, much smaller scale than a 100MW cluster.

              But if that’s the case… why even invest in orbital data centers in the first place?

              Why not desert ones? Why all this cash there instead of actually improving LLM architectures!?

              There are so many nested levels of absurdity here. It’s all just total mania, with zero punishment to those doing the funding because they are too rich to feel any consequences.