• حمید پیام عباسی@crazypeople.online
    link
    fedilink
    English
    arrow-up
    2
    ·
    16 hours ago

    800K is 526C! You can’t run a datacenter at that.

    Yeah, the temperature was an estimate for the nuclear reactor that would be needed lol, I tried to explain that most of the datacenter would be closer to room temperature which would require absurd sizes of radiators

    • brucethemoose@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      edit-2
      15 hours ago

      To be fair, 100MW is pretty big.

      AI doesn’t actually need that much. I’m pretty sure entire models like GLM 5.2 or Deepseek v4 are trained (and served) on a much, much smaller scale than a 100MW cluster.

      But if that’s the case… why even invest in orbital data centers in the first place?

      Why not desert ones? Why all this cash there instead of actually improving LLM architectures!?

      There are so many nested levels of absurdity here. It’s all just total mania, with zero punishment to those doing the funding because they are too rich to feel any consequences.