    But conversely it means it’s theoretically quite easy to fix: have energy storage at data centers so that unloading can result in the centre charging the storage while sending a message to the grid announcing its needs are decreasing. Then gradually decrease the load.

      • FishFace@piefed.social
        link
        fedilink
        English
        arrow-up
        2
        ·
        3 days ago

        In a functioning system, anyone connecting a large site to the grid would need to sign a contract about how they’ll use power which would include these provisions, and a contract without them would cost far more.